PROJECT ARCHIVE REVIEW
Guangzhou K11: Looking Back at Wall-Art Fabrication
Project archive review · Event date not documented
A look back at the forming, assembly and surface-finishing photographs behind the Guangzhou K11 wall-art archive.

Connecting the workshop stages with the installed composition
The existing archive brings together component preparation, structural assembly and reflective surface finishing with photographs of the elevator-lobby artworks. These records let readers compare the making stages with the final wall composition.
About this record
This is a retrospective based on existing project records, not a new project completion announcement. The listing date of August 27, 2026 does not establish the fabrication or installation date. Exact material grades and dimensions remain unconfirmed.
View the full case study →Discuss a sculpture for your project
Share drawings, target dimensions, site photographs and your intended schedule.
Request a Technical Proposal